CTS4000 battery test system

Cycling and characterisation for cells, modules and packs.

Answers directly to

What it is for here

The EV Smart Charge Points Regulations 2021 require a technical file containing test reports for charge points sold in Great Britain. Battery and charging test programmes generate exactly those reports, and they have to be defensible when a purchaser asks to see the file.

Why it is on the UK site

A GB-only regulation with a documentary requirement, on a product category this system already serves.

Specifications

Published figures for this line are held on the manufacturer’s current datasheet, and they change. Rather than reprint a table that goes stale, send the requirement — the standard, the device under test, the power envelope and the cadence — and an engineer will come back against the current document.

Send a requirement+44 1252 875600

Other systems