Grid connection and storage

G99 and G98 type verification, and the bench that can actually run it.

Who buys this: Inverter and storage manufacturers, and the consultancies that type-test for them.

Why it matters now

G99 Issue 2's requirements for Power Generating Modules incorporating Electricity Storage came into force on 1 March 2026. That is not a horizon to plan for — it is the regime a British storage or hybrid product is inside now.

What the work actually involves

G99 is unusually specific about method. Annex A.7.1.2.2 describes operating the module in parallel with a variable AC test supply, stepping voltage in increments of 0.5% or less, holding longer than the trip delay, then jumping in a single step so trip time can be measured — repeated across Interface Protection, LFSM-O, LFSM-U, RoCoF, Fault Ride Through and Vector Shift. The bench runs for days, which is where regeneration stops being a specification line and becomes an operating cost. The 16 A per phase threshold between G98 and G99 is a design decision, not a paperwork one.

Assessed against