Compliance
The documents a British power-electronics programme is actually assessed against. Every designation and issue number here carries the source it came from and the date we checked it, because in this field a page written from older sources is not slightly stale — it is wrong.
- Public document
- You can open it and check us. We name the clause and quote it where it matters.
- Restricted document
- Real, named, and behind Defence Gateway SSO or a standards paywall. We cite the designation and issue; we do not reproduce text we cannot license.
Public documents
- ENA EREC G99 Issue 2
Grid-code type testing to G99 Issue 2
The British connection standard for generation above the G98 threshold, and the one that names a variable AC test supply in its own text.
1 source · checked 2026-09-05 - ENA EREC G98 Issue 2
G98 and the 16 A per phase threshold
The fully-type-tested route for micro-generation up to and including 16 A per phase, and the line that decides whether you are in G98 or G99.
1 source · checked 2026-09-05 - SI 2024/696
Do you still need UKCA in 2026?
No. CE marking is accepted in Great Britain indefinitely for the EMC and Low Voltage regimes, and there is no end date.
2 sources · checked 2026-09-05 - SI 2016/1091 and SI 2016/1101
GB, the EU and Northern Ireland — three markets, one product
Both regimes that govern a programmable power source are self-declaration with no notified body, which has a consequence almost nobody states.
3 sources · checked 2026-09-05 - DEFCON 658
DEFCON 658 and Cyber Security Model v4
The MOD contract condition that flows down the whole supply chain, and the deadline attached to it.
3 sources · checked 2026-09-05 - SI 2021/1467
The EV smart charge point technical file
A GB-only regulation that requires a technical file containing test reports, for a product category Intepro already serves.
2 sources · checked 2026-09-05 - Def Stan 05-138
Def Stan 05-138 and the four Cyber Risk Profile levels
The control set behind DEFCON 658 — what a supplier must actually hold at Level 0, 1, 2 and 3, and where Cyber Essentials fits.
4 sources · checked 2026-09-06 - JOSCAR
JOSCAR — the register a defence buyer checks before they talk to you
The shared supplier due-diligence register for UK aerospace, defence and security, and what being on it does and does not prove.
3 sources · checked 2026-09-06 - Def Stan
Defence Standards — what they are, and where to get the current issue
How the Def Stan portfolio works, who maintains it, and the retrieval trap that leaves suppliers citing superseded issues.
4 sources · checked 2026-09-06
Restricted documents
- Def Stan 61-005 Part 6 Issue 7
Def Stan 61-005 Part 6 — military vehicle DC supplies
The British standard for DC electrical systems in land platforms, and the load dump you cannot generate with a bench supply.
2 sources · checked 2026-09-05 - Def Stan 59-411 Issue 3
Def Stan 59-411 against MIL-STD-461
Britain's defence EMC standard, and the two tests the American one does not have.
2 sources · checked 2026-09-05
What is deliberately not on this site
These were researched and could not be confirmed to a current source. Rather than publish a revision letter from memory, they are absent — and listed, so you can see the shape of the gap.
- · DO-160 / ED-14 current revision letter — NOT VERIFIED
- · MIL-STD-704 current revision — NOT VERIFIED
- · EN 50549-1 / -2 versions — NOT VERIFIED
- · BS 7671 current amendment number — NOT VERIFIED
- · The UK statutory 230 V supply tolerance under ESQCR 2002 — NOT VERIFIED
- · UK REACH deadlines — NOT VERIFIED
- · UKAS / ILAC mutual-recognition position — NOT VERIFIED
- · Whether GB's EMC designated-standards list has diverged from the EU's — checked, and the intuitive answer appears to be WRONG. Both lists look stalled at 2022. Do not publish a divergence claim.
- · INTEPRO UK'S CURRENT JOSCAR STATUS — the 2016 entry is documented in trade press, but JOSCAR requires annual renewal and the register is not public. We state the 2016 fact and nothing about today.
- · INTEPRO UK'S OWN CYBER RISK PROFILE LEVEL AND CYBER ESSENTIALS STATUS — a supplier's assigned CRP comes from the MOD delivery team per contract and is not ours to publish; our Cyber Essentials certification could not be confirmed on the IASME register.
